Gas Processing Plant-Egypt-Benfield Acid Gas Removal

Project Description: 

Processing plant, 2 x 248,000 Sm3/h (210 mmscfd) acid gas removal trains and 3 x 33% export compression trains to an export pressure of 101 bara, to process conventional gas  feed containing up to 8 mol% CO2 and 7 ppmv H2S, and 140 bbl/mmscf condensate.  Unit operations :

  • Separation
  • Acid gas removal utilizing the  Benfield Process (Hot Potassium Carbonate)
  • TEG dehydration
  • Dewpointing by turbo expander
  • Compression
  • Condensate stabilization for storage and transport
  • Condensate storage tanks 2 x 16,724 m3 (105,000 barrels) and export pumps

 

Product Specifications: 

  • Maximum CO2  3.0 mol%
  • Maximum  H2S  4 ppmv 
  • Water dewpoint of less than 0°C at 71 bara
  • Hydrocarbon cricondentherm of less than 5°C.
  • Condensate stabilized with a  TVP of less than 1.0 bara at 40°C.

 

    Location:  Arab Republic of Egypt

     

     

    Project Phase Involvement: 

     

     

    Services Provided: 

     

     

    Project Value: 

    Project Value $169 MM USD

     

     

    Project Date: 

    Plant Commissioned  2000

     

    Home Page: www.pellcon.com

     

     

    Project Images: 
    Condensate Storage Tanks
    Hot Oil Fired Heaters
    Plant Inlet Separator